[121 STAT. 1656]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1656]

121 STAT. 1656

PUBLIC LAW 110–140—DEC. 19, 2007

other appropriate environmental measures in the Capitol Complex Master Plan. (b) REPORT.—Not later than 6 months after the date of enactment of this Act, the Architect of the Capitol shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Rules and Administration of the Senate, a report on the energy efficiency and conservation measures, greenhouse gas emission reduction measures, and other appropriate environmental measures included in the Capitol Complex Master Plan pursuant to subsection (a). 2 USC 2162a.

Deadline.

SEC. 504. PROMOTING MAXIMUM EFFICIENCY IN OPERATION OF CAPITOL POWER PLANT.

(a) STEAM BOILERS.— (1) IN GENERAL.—The Architect of the Capitol shall take such steps as may be necessary to operate the steam boilers at the Capitol Power Plant in the most energy efficient manner possible to minimize carbon emissions and operating costs, including adjusting steam pressures and adjusting the operation of the boilers to take into account variations in demand, including seasonality, for the use of the system. (2) EFFECTIVE DATE.—The Architect shall implement the steps required under paragraph (1) not later than 30 days after the date of the enactment of this Act. (b) CHILLER PLANT.— (1) IN GENERAL.—The Architect of the Capitol shall take such steps as may be necessary to operate the chiller plant at the Capitol Power Plant in the most energy efficient manner possible to minimize carbon emissions and operating costs, including adjusting water temperatures and adjusting the operation of the chillers to take into account variations in demand, including seasonality, for the use of the system. (2) EFFECTIVE DATE.—The Architect shall implement the steps required under paragraph (1) not later than 30 days after the date of the enactment of this Act. (c) METERS.—Not later than 90 days after the date of the enactment of this Act, the Architect of the Capitol shall evaluate the accuracy of the meters in use at the Capitol Power Plant and correct them as necessary. (d) REPORT ON IMPLEMENTATION.—Not later than 180 days after the date of the enactment of this Act, the Architect of the Capitol shall complete the implementation of the requirements of this section and submit a report describing the actions taken and the energy efficiencies achieved to the Committee on Transportation and Infrastructure of the House of Representatives, the Committee on Commerce, Science, and Transportation of the Senate, the Committee on House Administration of the House of Representatives, and the Committee on Rules and Administration of the Senate. SEC. 505. CAPITOL POWER PLANT CARBON DIOXIDE EMISSIONS FEASIBILITY STUDY AND DEMONSTRATION PROJECTS.

dkrause on GSDDPC44 with PUBLAW

The first section of the Act of March 4, 1911 (2 U.S.C. 2162; 36 Stat. 1414, chapter 285) is amended in the seventh undesignated paragraph (relating to the Capitol Power Plant) under the heading ‘‘Public Buildings’’, under the heading ‘‘Under the Department of Interior’’— (1) by striking ‘‘ninety thousand dollars:’’ and inserting $90,000.’’; and

VerDate Aug 31 2005

07:12 Jan 26, 2009

Jkt 059194

PO 00002

Frm 00364

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT2.001

APPS10

PsN: 59194PT2