Page:United States Statutes at Large Volume 80 Part 1.djvu/743

This page needs to be proofread.

[80 STAT. 707]
PUBLIC LAW 89-000—MMMM. DD, 1966
[80 STAT. 707]

80 STAT. ]

PUBLIC LAW 89-561-SEPT. 7, 1966

707

Public Law 89-561 AN ACT

To authorize the Secretary of the Interior to engage in feasibility investigations of certain water resource development proposals.

September 7, 1966

'.

Be it enacted by the Senate and House of Representatives of the Water resource United States of America in Congress assembled, That the Secretary development proof the Interior is hereby authorized— posaisr feasibii (a) to perform such additional analysis and studies as may ^'y investigations be required on the following proposals which are pending before the Congress: Region 1 Chief Joseph Dam project, Chelan division, Manson unit, along Lake Chelan in north-central Washington; Columbia Basin project, third powerplant, on the Columbia River at Grand Coulee Dam in Washington; Rogue River Basin project. Merlin division, on Jumpoff Joe Creek, a tributary of the Rogue River, in southwestern Oregon; Tualatin project, first phase, on the Tualatin River, near the city of Portland, Oregon; Walla Walla project, Touchet division, on the Touchet River in southeastern Washington; Yakima project, Kennewick division extension, near the mouth of the Yakima River in south-central Washington. Region 3 Lower Colorado River Basin project, in the Lower Colorado River Basin in Arizona, California, New Mexico, Nevada, and Utah. Region 5 Canton project on the Canadian River below the existing Canton Reservoir in northwestern Oklahoma; Columbus Bend project on the Lower Colorado River Basin in Texas; Palmetto Bend project on the Lavaca and Navidad Rivers in Texas. Region 7 Missouri River Basin project, Midstate division, on the north side of the Platte River in central Nebraska; Missouri River Basin project. North Loup division, on the North Loup and l-roup Rivers in east-central Nebraska; and (b) to complete his analysis and studies and to prepare and process reports on the following proposals, which he anticipates will be completed or substantially completed on or before June 30, 1966: Region 1 Challis project, Challis Creek division, on Challis Creek in southern Idaho; Rathdrum Prairie project, Prairie division, East Greenacres unit in Idaho, along the Idaho-Washington State line east of Spokane, Washington;