Page:United States Statutes at Large Volume 90 Part 2.djvu/1451

This page needs to be proofread.

PUBLIC LAW 94-000—MMMM. DD, 1976

PUBLIC LAW 94-587—OCT. 22, 1976 LOWER M I S S I S S I P P I RIVER

BASIN

The project for flood protection for St. J o h n s Bayou and New M a d r i d Floodway, Missouri: E e p o r t of the Chief of Engineers dated September 26, 1975, at an estimated cost of $300,000. The project for flood protection for Nonconnah Creek, Tennessee and Mississippi: E e p o r t of the Chief of Engineers dated June 23, 1976, and as an independent part of this project, improvements for flood control and allied purposes on H o r n L a k e Creek and tributaries, including Cowpen Creek, Tennessee and Mississippi, at an estimated cost of ^00,000. TEXAS GITLF COAST R E G I O N

The project for n a t u r a l salt pollution control in the Brazos R i v e r: Report of the Chief of Engineers dated June 1, 1976, at an estimated cost of $650,000. R i o GRANDE

BASIN

The project for flood control and other purposes, on the Rio G r and e and Rio Salado (Rio P u e r c o), New Mexico: Report of the Chief of Engineers dated September 27, 1976, at an estimated cost of $1,500,000. MISSOURI RIVER

BASIN

The project for flood protection for Jefferson City on W e a r s Creeks, Missouri: Report of the Chief of Engineers dated October 21, 1975, at an estimated cost of $50,000. COLUMBIA RIVER

BASIN

The project for construction and installation of a second powerhouse at McNary Lock and Dam, Columbia River, Oregon and Washington: Report of the Chief of Engineers dated June 29, 1976, at an estimated cost of $1,800,000. PEMBINA RIVER

BASIN

The project for flood control on the Pembina River at Walhalla, North D a k o t a: Report of the Division Engineer dated May 24, 1976, at an estimated cost of $930,000. T h i s shall take effect upon submittal to the Secretary of the Army by the Chief of Engineers and notification to Congress of the approval of the Chief of Engineers. CALLEGUAS C R E E K

BASIN

The project for flood control and other purposes on Calleguas Creek, Simi Valley to Moorpark, Ventura County, California: Report of the Chief of Engineers dated June 21, 1976, a t an estimated cost of $1,060,000. SACRAMENTO-SAN J O A Q U I N

BASIN

The project for flood control and other purposes on Morrison Creek Stream Group, California: Report of the Chief of Engineers dated March 2, 1976, at an estimated cost of $750,000. NORTH-EASTERN A T L A N T I C COASTAL R E G I O N

The project for navigation improvements in New London H a r b o r and Thames River at New London, Connecticut: Report of the Chief

90 STAT. 2919