Page:United States Statutes at Large Volume 94 Part 1.djvu/835

This page needs to be proofread.

PUBLIC LAW 96-000—MMMM. DD, 1980

PUBLIC LAW 96-295—JUNE 30, 1980

94 STAT. 785

assessment to the appropriate committees of the Congress withm 6 months of the date of the enactment of this Act, (4) identify which, if any, of the States described in paragraph (2) do not have adequate plans and preparations for such an emergency and notify the Governor and other appropriate authorities in each such State of the respects in which such plans and preparations, if any, do not conform to the guidelines promulgated under paragraph (1), and (5) submit a report to Congress containing (A) the results of its actions under the preceding paragraphs and (B) its recommendations respecting any additional Federal statutory authority which the Commission deems necessary to provide that adequate plans and preparations for such radiological emergencies are in effect for each State described in paragraph (2). (c) In carrying out its review and assessment under subsection (b) (2) and (3) and in submitting its report under subsection (a)(5), the Commission shall include a review and assessment, with respect to each utilization facility and each site for which a construction permit has been issued for such a facility, of the emergency response capability of State and local authorities and of the owner or operator (or proposed owner or operator) of such facility. Such review and assessment shall include a determination by the Commission of the maximum zone in the vicinity of each such facility for which evacuation of individuals is feasible at various different times corresponding to the representative warning times for various different t5T)es of accidents. SEC. 110. (a) Of the amounts authorized to be appropriated pursuant to section 101(a), such sums as may be necessary shall be used by the Nuclear Regulatory Commission to develop, submit to the Congress, and implement, as soon as practicable after notice and opportunity for public comment, a comprehensive plan for the systematic safety evaluation of all currently operating utilization facilities required to be licensed under section 103 or section 104(b) of the Atomic Energy Act of 1954. 42 USC 2133, (b) The plan referred to in subsection (a) shall include— ^^^'*" (1) the identification of each current rule and regulation compliance with which the Commission specifically determines to be of particular significance to the protection of the public health and safety; (2) a determination by the Commission of the extent to which each operating facility complies with each rule and regulation identified under paragraph (1) of this subsection, including an indication of where such compliance was achieved by use of Division 1 regulatory guides and staff technical positions and where compliance was achieved by equivalent means; (3) a list of the generic safety issues set forth in NUREG 0410 (including categories A, B, C, and D) for which technical solutions have been developed; (4) a determination by the Commission of which technical solutions for generic safety issues identified in paragraph (3) of this subsection should be incorporated into the Commission's rules and regulations; and (5) a schedule for developing a technical solution to those generic safety issues listed in NUREG 0410 which have not yet been technically resolved.