This page needs to be proofread.



four thousand and six thousand feet above sea-level. It is the county-seat of Okanogan County, and the centre of the mining district.

The principal mines are on the south side of the creek, in a ridge rising abruptly from it to a height of two thousand five hundred feet. There is plenty of timber, but no water for mining purposes, and the ores must be conveyed over a very rough trail, or by a wire tramway to reduction works on the Conconnully, a method which is entirely practicable.

The country rock of Ruby district is granite, gneiss, mica, and hornblende schists, which have been uplifted to nearly vertical positions. The width of the zone of gneissoid granites and schists is about three miles, flanked on the southwest by a high granite range, and the mineral belt is confined to this zone—the silver-bearing lodes conforming substantially to the generally southeast-and-northwest course of the schistose rocks, with a dip varying from fifty degrees to the nearly vertical position, with frequent local variations.

One of the latter is the Arlington, which has a north-andsouth direction, and is situated in the southerly end of Ruby Mountain, about three hundred feet from the top, with a dip into the mountain of from sixty to eighty degrees below the horizontal. The lode is from three to nine feet wide, and has been traced for a distance of seven hundred feet. The ore assays one hundred and eighty-seven dollars in silver to the ton, or, taking all classes of ore together, eighty-six dollars and sixty-four cents, with merely a trace of gold. Professor Clayton, in a report on the Ruby district, to which I am indebted for figures, estimated that a block of ground three hundred feet long, sixty feet deep, and five in width, making ninety thousand cubic feet of quartz in the lode, would give about six thousand tons gross, and, assuming that half of that would assay eighty dollars per ton, the gross value would he two hundred and forty thousand dollars. Deducting ten per cent, loss in milling (twenty-four thousand dollars) and twenty dollars per ton for the cost of milling, mining, and transportation (sixty thousand dollars), there would remain one hundred and fifty thousand dollars net from this block of ground, which he considered a safe estimate. What the actual yield is has not been made