This page has been proofread, but needs to be validated.
THE ART OF PROGRAM MAKING
141

cerning musical performance manifested by the average audience of today as compared with that of fifty years ago is also partly responsible; but the brunt of the charge must be borne by our habitual attitude of nervous hurry, our impatience with slow processes of any kind, and the demand for constant change of sensation that is coming to characterize Americans of all ages and classes. It is doubtless unfortunate that conditions are as they are; but since the attitude of our audiences has admittedly undergone a decided change, it behooves the program maker to face conditions as they actually exist, rather than to pretend that they are as he should like them to be. Since our audiences are harder to hold now than formerly, and since our first-class performers (except possibly in the case of orchestral music) are probably not greatly above the level of the first-class performers of a generation ago (although larger in number), it will be necessary to keep the listener interested by employing methods of program making, which, although they have always been not only entirely legitimate but highly desirable, are now absolutely necessary. As stated above, the obvious way to help our audience to listen to an entire concert is to provide variety of material—a heavy number followed by a light one; a slow, flowing adagio by a bright snappy scherzo; a tragic and emotionally taxing song like the Erl-King by a sunny and optimistic lyric; a song or a group of songs in major possibly relieved by one in minor; a coloratura aria by a song in cantabile style; a group of songs in French by a group in English; a composition in severe classic style by one of romantic tendency, et cetera. These contrasting elements are not, of course, to be introduced exactly as they are here listed, and this series of possible contrasts is cited rather to give the amateur maker of programs an idea of what is meant by contrast rather than to lay down rules to be followed in the actual construction of programs.