160
SHOP MANAGEMENT
TABLE 2A
Note Sheet Department Men Implements Description Loading Barrow
Material Capacity of a barrow, cu. ft. No. shovels per barrow Capacity of a shovel cu. ft. No. obs. Time filling barrow, minutes Time per shovel, minutes Time per cu. ft., minutes Remarks
3-10-03 Construction Johnson Flaherty No. 3 shovel and contractor's wood barrow.
Wheeler loading his own barrow Clay 13.5 4 1.948 0.144
Flaherty Same Same Sand 13.2 4 1.240 0.094
Starting Wheeling Full Dumping
No. obs. Time per barrow, minutes Time per cu. ft., minutes No. obs. Distance wheeled, ft. Total time wheeling barrow, minutes Time per 100 ft. per barrow, minutes Time per 100 ft. per cu. ft., minutes Remarks No. obs. Time per barrow, minutes Time per cu. ft., minutes
4 0.182 4 50 0.225 0.450 Level 4 0.172