There was a problem when proofreading this page.
MOBILE LANE CLOSURE TECHNIQUE
'TRAFFIC COUNT FORM FOR MOBILE LANE CLOSURES
DATE: |
LOCATION: |
OPERATION: |
CONTRACTOR: |
CLIENT SUPERVISOR: |
WEATHER: |
TIME CLOSURE ON: |
CLOSURE OPERATIVES: |
SUPERVISOR: |
BLOCK VEHICLES: |
200 YARDS VEHICLE: |
500 YARDS VEHICLE: |
800 YARDS VEHICLE: |
OTHER (STATE): |
TIME CLOSURE OFF: |
Traffic flow limits applicable during the Mobile Lane Closure operation.
Traffic flow level above which the closure cannot be put into effect. | Maximum allowable traffic flow level (see Table 10.1) |
TRAFFIC COUNT
Time of count |
Marker post |
Vehicles per 3 minutes | In limit? Yes/No |
Remarks, incidents and stops | ||
Cars | HGVs | Total | ||||
Figure 10.2 Traffic count form for MLC operations
NOTE: This form may be photocopied for operational use.
120