PUBLIC LAW 101-514—NOV. 5, 1990 104 STAT. 2075 further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to initiate and complete preconstruction engineering and design of the LaConner, Washington, project using funds appropriated for that purpose in the Energy and Water Development Appropriations Act, 1990, Public Law 101-101: Provided further, That the Secretary of the Army is authorized, in partnership with the Department of Transportation, and in coordination with other Federal agencies, including the Department of Energy, to conduct research and development associated with an advanced high speed magnetic levitation transportation system: Provided further, That notwithstanding any other provision of law, the funds appropriated to the Corps of Engineers in Public Law 101-101 for Magnetic Levitation Research and Development activities are hereby authorized for expenditure only in accordance with the directions contained in Senate Report 101-83 and House Report 101-235: Provided further. That with $200,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to resume preconstruction engineering and design of the St. Louis Harbor, Missouri and Illinois, project: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $250,000 of the funds appropriated herein to complete the Los Angeles-Long Beach Harbors project feasibility study and is further directed to use $2,000,000 of the funds appropriated herein to initiate preconstruction engineering and design of that project upon release of the South Pacific Division Engineer's notice of completion of the feasibility report: Provided further. That with $200,000 of the funds appropriated in the Energy and Water Development Appropriations Act, 1990, Public Law 101-101, together with $300,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue preconstruction engineering and design of the Red River Waterway, Index, Arkansas, to Denison Dam, Texas, project: Provided further. That with $800,000 of the funds provided herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to accelerate preconstruction engineering and design for the Folly Beach, South Carolina, project and complete the General Design Memorandum by May 1991 so that project construction could begin in the fourth quarter of fiscal year 1992: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $300,000 of the funds appropriated herein to initiate and expedite a reconnaissance study to develop a recommended plan for flood damage prevention and other water resources problems along the Ohio River and its tributaries in Belmont and Jefferson Counties, Ohio: Provided further. That using $270,000 of funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to initiate and complete engineering and design of the Bethel, Alaska, bank stabilization project. CONSTRUCTION, GENERAL For the prosecution of river and harbor, flood control, shore protection, alteration and removal of obstructive bridges, and related projects authorized by laws; and detailed studies, and plans and specifications, of projects (including those for development with participation or under consideration for participation by States, local governments, or private groups) authorized or made eligible for
�