Page:United States Statutes at Large Volume 104 Part 4.djvu/281

This page needs to be proofread.

PUBLIC LAW 101-549—NOV. 15, 1990 104 STAT. 2597 an affected unit under this section) and part of a utility system that includes 1 or more affected units under section 405 for reductions in the emissions of sulfur dioxide made during the period 1995-1999 if the unit meets the requirements of this subsection and the requirements of the preceding sentence, except that for the purposes of applying this subsection to any such unit, the prior year concerned as specified below, shall be any year after January 1, 1995 but prior to January 1, 2000. "(2) In the case of an affected unit under this section described in subparagraph (A), the allowances allocated under this subsection for early reductions in any prior year may not exceed the amount which (A) the product of the unit's baseline multiplied by the unit's 1985 actual sulfur dioxide emission rate (in lbs. per mmBtu), divided by 2,000, exceeds (B) the allowances specified for such unit in Table A. In the case of an affected unit under section 405 described in subparagraph (A), the allowances awarded under this subsection for early reductions in any prior year may not exceed the amount by which (i) the product of the quantity of fossil fuel consumed by the unit (in mmBtu) in the prior year multiplied by the lesser of 2.50 or the most stringent emission rate (in lbs. per mmBtu) applicable to the unit under the applicable implementation plan, divided by 2,000, exceeds (ii) the unit's actual tonnage of sulfur dioxide emission for the prior year concerned. Allowances allocated under this subsection for units referred to in subparagraph (A) may be allocated only for emission reductions achieved as a result of physical changes or changes in the method of operation made after the date of enactment of the Clean Air Act Amendments of 1990, including changes in the type or quality of fossil fuel consumed. "(3) In no event shall the provisions of this paragraph be interpreted as an event of force majeur or a commercial impractibility or in any other way as a basis for excused nonperformance by a utility system under a coal sales contract in effect before the date of enactment of the Clean Air Act Amendments of 1990. "TABLE A.—AF FECTED SOURCES AND UNITS IN PHASE I AND THEIR SULFUR DIOXIDE ALLOWANCES (TONS) Phase I State Plant Name Generator Allowances Alabama Colbert E.C.Gaston. Florida Big Bend Crist Georgia Bowen 1 2 3 4 5 1 2 3 4 5 1 2 3 6 7 1 2 3 13,570 15,310 15,400 15,410 37,180 18,100 18,540 18,310 19,280 59,840 28,410 27,100 26,740 19,200 31,680 56,320 54,770 71,750