Page:United States Statutes at Large Volume 114 Part 2.djvu/679

This page needs to be proofread.

PUBLIC LAW 106-377—APPENDIX B 114 STAT. 1441A -61 no part of any appropriation contained in this Act shall be expended or obligated to begin Phase II of the John Day Drawdown study or to initiate a study of the drawdown of McNary Dam unless authorized by law: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed hereafter to use available Construction, General funds in addition to funding provided in Public Law 104-206 to complete design and construction of the Red River Regional Visitors Center in the vicinity of Shreveport, Louisiana at an estimated cost of $6,000,000: Provided farther. That section 101(b)(4) of the Water Resources Development Act of 1996, is amended by striking "total cost of $8,600,000" and inserting "total cost of $15,000,000": Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $3,000,000 of the funds appropriated herein for additional emergency bank stabilization measures at Galena, Alaska under the same terms and conditions as previous emergency bank stabilization work undertaken at Galena, Alaska pursuant to section 116 of Public Law 99-190: Provided further. That with $4,200,000 of the funds appropriated herein, the Secretary of the Army, acting through the Chief of Engineers, is directed to continue construction of the Brunswick County Beaches, North Carolina- Ocean Isle Beach portion in accordance with the General Reevaluation Report approved by the Chief of Engineers on May 15, 1998: Provided further, That the Secretary of the Army, acting through the Chief of Engineers, is directed to use not to exceed $300,000 of funds appropriated herein to reimburse the City of Renton, Washington, at full Federal expense, for mitigation expenses incurred for the flood control project constructed pursuant to 33 U.S.C. 701s at Cedar River, City of Renton, Washington, as a result of over-dredging by the Army Corps of Engineers: Provided further, That $2,000,000 of the funds appropriated herein shall be available for stabilization and renovation of Lock and Dam 10, Kentucky River, Kentucky, subject to enactment of authorization by law: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to use $3,000,000 of the funds appropriated herein to initiate construction of a navigation project at Kaumalapau Harbor, Hawaii: Provided further. That the Secretary of the Army is directed to use $2,000,000 of the funds provided herein for Dam Safety and Seepage/Stability Correction Program to design and construct seepage control features at Waterbury Dam, Winooski River, Vermont: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, is directed to design and construct barge lanes at the Houston- Galveston Navigation Channels, Texas, project, immediately adjacent to either side of the Houston Ship Channel, from Bolivar Roads to Morgan Point, to a depth of 12 feet with prior years' Construction, General carry-over funds: Provided further. That the Secretary of the Army, acting through the Chief of Engineers, may use Construction, General funding as directed in Public Law 105-62 and Public Law 105-245 to initiate construction of an emergency outlet from Devils Lake, North Dakota, to the Sheyenne River, except that the funds shall not become available unless the Secretary of the Army determines that an emergency (as defined in section 102 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act (42 U.S.C. 5122)) exists with respect to the emergency need for the outlet and reports to Congress that the construction is technically sound, economically justified, and