Page:United States Statutes at Large Volume 117.djvu/1863

This page needs to be proofread.

[117 STAT. 1844]
PUBLIC LAW 107-000—MMMM. DD, 2003
[117 STAT. 1844]

117 STAT. 1844

113 Stat. 312.

114 Stat. 2763A–221.

VerDate 11-MAY-2000

10:15 Aug 27, 2004

PUBLIC LAW 108–137—DEC. 1, 2003

(2) by striking ‘‘Lake and Porter’’ and inserting ‘‘Benton, Jasper, Lake, Newton, and Porter’’. SEC. 146. The Secretary of the Army, acting through the Chief of Engineers, is authorized to construct the project for flood control, Meramec River Basin, Valley Park Levee, Missouri, originally authorized by Public Law 97–128 (95 Stat. 1682) and modified by section 1128 of WRDA 1986 and section 333 of WRDA 1999, at a maximum Federal expenditure of $50,000,000. SEC. 147. The project for flood control, Saw Mill Run, Pennsylvania, authorized by section 401(a) of Public Law 99–662 (100 Stat. 4124) and modified by section 301(a) of Public Law 104– 303 (110 Stat. 3708), is further modified to authorize the Secretary to carry out the project at a total cost of $22,000,000, with an estimated Federal cost of $16,500,000 and an estimated non-Federal cost of $5,500,000. SEC. 148. The project for flood control, Roanoke River Upper Basin, Virginia, authorized by section 401(a) of Public Law 99– 662 (100 Stat. 4126), is further modified to authorize the Secretary to construct the project at a total cost of $61,700,000, with an estimated Federal cost of $43,000,000 and an estimated non-Federal cost of $18,700,000. SEC. 149. The project for harbor deepening, Brunswick Harbor, Georgia, authorized by section 101(a)(19), Public Law 106–53, and amended by the fiscal year 2003 Consolidated Appropriations Act, Public Law 108–7, is further modified to authorize the Secretary to construct the project at a total cost of $96,276,000 with an estimated Federal cost of $61,709,000 and an estimated non-Federal cost of $34,567,000. SEC. 150. The project for flood control, Lackawanna River at Olyphant, Pennsylvania, authorized by section 101(16) of Public Law 102–580 (106 Stat. 4797), is modified to authorize the Secretary to carry out the project at a total cost of $23,000,000, with an estimated Federal cost of $17,250,000 and an estimated non-Federal cost of $5,750,000. SEC. 151. PERRY CREEK, IOWA. The project for flood protection, Perry Creek Flood Control Project, Sioux City, Iowa, authorized under section 401(a) of the Water Resources Development Act of 1986, is modified to increase the project authorization to $96,870,000 (Federal cost of $58,677,000 and non-Federal cost of $38,193,000). SEC. 152. ELIZABETH RIVER, CHESAPEAKE, VIRGINIA. Section 358 of Public Law 106–53 is modified by striking ‘‘September 30, 1999,’’ and inserting ‘‘May 1, 1997,’’. SEC. 153. Section 219(f) of the Water Resources Development Act of 1992 is amended by adding at the end the following: ‘‘(71) $6,430,000 for environmental infrastructure for Indianapolis, Indiana;’’. SEC. 154. MISSISSIPPI RIVER AND BIG MUDDY RIVER, ILLINOIS. (a) IN GENERAL.—The project for flood control, Mississippi River and Big Muddy River, Illinois, authorized by the Flood Control Act of 1938, is modified to authorize the Secretary to carry out repair and rehabilitation of the project at a total cost of $22,600,000, with an estimated Federal cost of $16,950,000 and an estimated non-Federal cost of $5,650,000, and to perform operation and maintenance of the project thereafter.

Jkt 019194

PO 00000

Frm 00796

Fmt 6580

Sfmt 6581

D:\STATUTES\2003\19194PT2.001

APPS10

PsN: 19194PT2