PUBLIC LAW 109–59—AUG. 10, 2005
119 STAT. 1325
Highway Projects High Priority Projects—Continued
No. 1761 1762 1763 1764 1765
1766 1767
1768 1769 1770 1771
1772 1773 1774 1775 1776 1777 1778 1779 1780 1781 1782 1783
VerDate 14-DEC-2004
13:51 Oct 26, 2006
State
Project Description
MA
Acquisition, engineering, design, and construction of the Assabet River Rail Trail, Acton, Hudson, Maynard, and Stow .......................... Conduct Feasibility Study to Extend I–475 to U.S. 23 in Genesee County ............................. Construct a reliever route on U.S. 287 South of Dumas to U.S. 287 North of Dumas .......... construct new exit on I–75 and connect U.S. 11, U.S. 411, and SR 30 .................................. Design, engineering, ROW acquisition and construction of street improvements, parking, safety enhancements and roadway redesign in Pittston ................................................ Dowlen Road Improvements for Beaumont, Texas ................................................................ Construct Hwy 101 bicycle-pedestrian project in Marin and Sonoma Counties from north of Atherton Ave. to south of Petaluma River bridge ................................................................ Construct raised median from Loop 224 to Sradley St. in Nacogdoches, TX ..................... Construction of bicycle trail extension in Geauga Park District in Chardon, OH .......... Extension of a regional Class I bikeway from the West City limits to the East City limits along leased railroad right-of-way ................. For rail grade separations identified by the MPO for the Little Rock/North Little Rock metropolitan area, (which may include: Edison Ave.; Springer Blvd.; Hwy 89 Extension; McCain/Fairfax; Salem Road; J.P. Wright Loop; South Loop; Geyer Springs Rd) ........... Court Street and Smith Street Shopping District Enhancements ......................................... Hampshire County Bike Paths, Design and Construction .................................................... Construct I–15 Starr Interchange ..................... Construct full-access interchange at SR 120— McKinley Avenue, with the necessary SR 120 auxiliary lanes, Manteca, CA .................. Install emergency vehicle preemption equipment along major arterials in the I–880 corridor, Alameda County .................................... Construct a proposed relocation of U.S. 22 and SR 93 from the current IR 70, U.S. 40 west of Zanesville ..................................................... Conduct Study and Construct I–205 Chrisman Road Interchange Project, Tracy, CA ............ Construction of part of a 230 mile corridor U.S. 67 near Jerseyville and Carrolton, Illinois ................................................................... Construction of Campus Parkway from State Route 99 to Yosemite Ave., Merced County .. Construction of Superior Road Roundabout, Superior Township .......................................... Construction and preliminary engineering of a railroad crossing at the intersection of Havlik Road and Hwy 30, Scappoose ............ Clark Road Clover Leaf at I–95, Jacksonville ..
MI TX TN PA
TX CA
TX OH CA AR
NY MA NV CA CA OH CA IL CA MI OR FL
Jkt 039194
PO 00002
Frm 00182
Fmt 6580
Sfmt 6581
Amount
$1,500,000 $480,000 $2,400,000 $3,600,000
$1,400,000 $2,764,800
$400,000 $2,680,000 $400,000 $320,000
$8,000,000 $640,000 $4,400,000 $8,000,000 $3,200,000 $400,000 $4,800,000 $800,000 $1,360,000 $400,000 $600,000 $198,400 $4,400,000
E:\PUBLAW\PUBL002.119
APPS06
PsN: PUBL002
�