Page:United States Statutes at Large Volume 119.djvu/1420

This page needs to be proofread.

[119 STAT. 1402]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1402]

119 STAT. 1402

PUBLIC LAW 109–59—AUG. 10, 2005 Highway Projects High Priority Projects—Continued

No. 3778

3779

3780 3781 3782

3783

3784

3785

3786 3787 3788 3789

3790 3791 3792

3793 3794

3795

3796 3797 3798

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

State

Project Description

CA

Virginia Corridor Rails to Trails: Reconstruct Union Pacific Right-of-Way to bicycle and pedestrian trail, City of Modesto, Stanislaus County .............................................................. Construct bicycle and pedestrian trail between Port Costa and Martinez as part of the San Francisco Bay Trail, Contra Costa County ... Improve air quality in the Sacramento region, Sacramento Area Council of Governments ... Builds a pedestrian bridge from Hiller Street to the Bay Trail, Belmont ............................... Plan and improve Orange County’s transportation system to reduce congestion, Orange County Council of Governments .................... Construct 20 mile managed lanes on Interstate 15 between State Route 163 and State Route 78 (San Diego) ...................................... Design and construct access improvements in North Central Business District, Sacramento ............................................................ Modify I–880 and Stevens Creek Boulevard Interchange to ease traffic congestion in San Jose ................................................................... Construction of Cross Valley Connector between I–5 and SR 14 ....................................... I–680: Construct High Occupancy Toll Lanes in Alameda County ......................................... Interchange Improvements: Laval and I–5, City of Lebec .................................................... Planning, design, engineering, and construction of Naval Air Station, North Island access tunnel on SR 75–282 corridor, San Diego ................................................................. ITS Improvements—City of Pasadena .............. Construct Interchange at Harbor Blvd. and I– 80 in West Sacramento ................................... Road and signage improvements, Southeast corner of Tahquitz Canyon Way and Hermosa Drive, Agua Caliente Museum, Palm Springs ................................................... To improve California Avenue between Willow and Spring Streets, Long Beach .................... For Environmental Review Process at I–5 Interchanges, Stockton, North Grove, Eight Mile Road, Otto Drive, and Hammer Lane ... Folsom Boulevard Corridor Transportation Enhancements, between Rod Beaudry Drive and Sunrise Boulevard, City of Rancho Cordova .................................................................. Construct I–80 HOV lanes and interchange in Vallejo ............................................................... Alameda Corridor SR 47 Port Access Expressway design ....................................................... Rehabilitation, repair and/or reconstruction of deficient 2-lane roads that connect to Interstate 5, SR 180, SR 41 and SR 99 countywide, Fresno County .......................................

CA

CA CA CA

CA

CA

CA

CA CA CA CA

CA CA CA

CA CA

CA

CA CA CA

Frm 00259

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

Amount

APPS06

$3,000,000

$1,000,000 $5,000,000 $1,000,000

$1,000,000

$5,000,000

$2,000,000

$3,000,000 $5,000,000 $2,000,000 $4,000,000

$5,000,000 $2,000,000 $1,000,000

$500,000 $1,000,000

$500,000

$1,000,000 $2,000,000 $2,000,000

$1,500,000

PsN: PUBL002