Page:United States Statutes at Large Volume 119.djvu/1461

This page needs to be proofread.

[119 STAT. 1443]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 1443]

PUBLIC LAW 109–59—AUG. 10, 2005

119 STAT. 1443

Highway Projects High Priority Projects—Continued

No. 4876 4877 4878 4879 4880 4881 4882

4883

4884 4885

4886 4887

4888

4889 4890 4891 4892 4893 4894 4895 4896 4897

VerDate 14-DEC-2004

13:51 Oct 26, 2006

State

Project Description

SC

Complete a multi-lane widening project on SC Hwy 5 Bypass in York County, SC between I–77 and I–85 .................................................. Re-construction of an existing interchange at I–385 and SC 14, in Laurens County ............ Construction of the Lexington Connector in Lexington County, to alleviate traffic congestion .................................................................... Widening of 4.4 miles of West Georgia Road in Greenville County ........................................... Extension of Wells Highway in Oconee County Demolition of the old Cooper River Bridges in Charleston ........................................................ Transportation Improvements for the I–73 in South Carolina-Proposed interstate corridor beginning at NC State line continuing to the Grand Strand area of SC ................................ Transportation Improvements for the U.S. 278 in Beaufort/Jasper County to alleviate roadway capacity constraints and improve safety and operations ................................................. ICAR Roads, Greenville, reconstruction of roads around Fairforest Way for better flow into ICAR ......................................................... Harden Street Improvements in Columbia. Specific improvements will include: modern traffic control signals, intersections, improved street lighting, driveways etc ............. Palmetto Parkway, Phase 2 is approximately 6 miles long and begins at U.S. 1/78 and terminates at I–20 ............................................... Lexington Connector in South Carolina, to alleviate traffic congestion along three major thoroughfares in Lexington County: U.S. 1, U.S. 378, and SC 6 .......................................... I–77/Peach Road Interchange in Fairfield County, SC, project would create interchange to encourage development at industrial park .......................................................... I–95/SC 327 in Florence, SC, to construct northbound ramp and expand existing ramps ................................................................ Transportation Improvements for Highway 901, York County, SC ..................................... The Extension of the Mark Clark Expressway in Charleston County ...................................... Construction of 4-lane highway on U.S. 79 between Maverick Junction, and the Nebraska border ............................................................... Reconstruct, S. Rochford Road from Rochford to Deerfield Rd ................................................ Reconstruct SD–50 Cherry Street in Vermillion ........................................................ Construct Rush Lake Crossing U.S. 12 near Webster ............................................................ Construct Phase I/South Connector Broadway to 29th Street, Watertown .............................. Construct Intersection of State Hwy 212 and U.S. 81, Watertown .........................................

SC SC SC SC SC SC

SC

SC SC

SC SC

SC

SC SC SC SD SD SD SD SD SD

Jkt 039194

PO 00002

Frm 00300

Fmt 6580

Sfmt 6581

Amount

$4,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $5,000,000

$5,000,000

$2,000,000 $2,000,000

$5,000,000 $3,000,000

$1,000,000

$3,000,000 $3,000,000 $1,000,000 $3,000,000 $27,000,000 $9,000,000 $3,000,000 $8,000,000 $3,600,000 $2,500,000

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002