Page:United States Statutes at Large Volume 119.djvu/2266

This page needs to be proofread.

[119 STAT. 2248]
PUBLIC LAW 109-000—MMMM. DD, 2005
[119 STAT. 2248]

119 STAT. 2248

Louisiana.

PUBLIC LAW 109–103—NOV. 19, 2005

protection within 6 months of enactment of this Act, interim protection within 12 months of enactment of this Act and long-term comprehensive protection within 24 months of enactment of this Act: Provided further, That the Secretary shall consider providing protection for a storm surge equivalent to a Category 5 hurricane within the project area and may submit reports on component areas of the larger protection program for authorization as soon as practicable: Provided further, That the analysis shall be conducted in close coordination with the State of Louisiana and its appropriate agencies. CONSTRUCTION

For expenses necessary for the construction of river and harbor, flood control, shore protection and storm damage reduction, aquatic ecosystem restoration, and related projects authorized by law; for conducting detailed studies, and plans and specifications, of such projects (including those involving participation by States, local governments, or private groups) authorized or made eligible for selection by law (but such detailed studies, and plans and specifications, shall not constitute a commitment of the Government to construction); $2,372,000,000, to remain available until expended; of which such sums as are necessary to cover the Federal share of construction costs for facilities under the Dredged Material Disposal Facilities program shall be derived from the Harbor Maintenance Trust Fund as authorized by Public Law 104–303; and of which such sums as are necessary pursuant to Public Law 99– 662 shall be derived from the Inland Waterways Trust Fund, to cover one-half of the costs of construction and rehabilitation of inland waterways projects, (including the rehabilitation costs for Lock and Dam 11, Mississippi River, Iowa; Lock and Dam 19, Mississippi River, Iowa; Lock and Dam 24, Mississippi River, Illinois and Missouri; Lock 27, Mississippi River, Illinois; and Lock and Dam 3, Mississippi River, Minnesota) shall be derived from the Inland Waterways Trust Fund; and of which $12,000,000 shall be exclusively for projects and activities authorized under section 107 of the River and Harbor Act of 1960; and of which $500,000 shall be exclusively for projects and activities authorized under section 111 of the River and Harbor Act of 1968; and of which $7,000,000 shall be exclusively for projects and activities authorized under section 103 of the River and Harbor Act of 1962; and of which $40,000,000 shall be exclusively available for projects and activities authorized under section 205 of the Flood Control Act of 1948; and of which $15,000,000 shall be exclusively for projects and activities authorized under section 14 of the Flood Control Act of 1946; and of which $300,000 shall be exclusively for projects and activities authorized under section 208 of the Flood Control Act of 1954; and of which $30,000,000 shall be exclusively for projects and activities authorized under section 1135 of the Water Resources Development Act of 1986; and of which $30,000,000 shall be exclusively for projects and activities authorized under section 206 of the Water Resources Development Act of 1996; and of which $5,000,000 shall be exclusively for projects and activities authorized under sections 204 and 207 of the Water Resources Development Act of 1992 and section 933 of the Water Resources Development Act of 1986: Provided, That the Chief of Engineers is directed to use $11,250,000 of the funds appropriated herein for the Dallas Floodway Extension, Texas, project, including the Cadillac Heights

VerDate 14-DEC-2004

13:51 Oct 26, 2006

Jkt 039194

PO 00002

Frm 01105

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL002.119

APPS06

PsN: PUBL002