Page:United States Statutes at Large Volume 120.djvu/3386

This page needs to be proofread.
[120 STAT. 3355]
PUBLIC LAW 109-000—MMMM. DD, 2006
[120 STAT. 3355]

PUBLIC LAW 109–451—DEC. 22, 2006

120 STAT. 3355

(g) COST-SHARING REQUIREMENT.— (1) IN GENERAL.—Except as otherwise provided in this subsection, the Federal share of the cost of a feasibility study carried out under this section shall not exceed 50 percent of the study costs. (2) FORM.—The non-Federal share under paragraph (1) may be in the form of any in-kind services that the Secretary determines would contribute substantially toward the conduct and completion of the study. (3) FINANCIAL HARDSHIP.—The Secretary may increase the Federal share of the costs of a feasibility study if the Secretary determines, based on a demonstration of financial hardship, that the non-Federal participant is unable to contribute at least 50 percent of the costs of the study. (4) LARGER COMMUNITIES.—In conducting a feasibility study of a rural water supply system that includes a community with a population in excess of 50,000 inhabitants, the Secretary may require the non-Federal project entity to pay more than 50 percent of the costs of the study. (h) CONSULTATION AND COOPERATION.—In addition to the nonFederal project entity, the Secretary shall consult and cooperate with appropriate Federal, State, tribal, regional, and local authorities during the conduct of each feasibility assessment and development of the feasibility report conducted under this title. SEC. 107. MISCELLANEOUS.

43 USC 2406.

(a) AUTHORITY OF SECRETARY.—The Secretary may enter into contracts, financial assistance agreements, and such other agreements, and promulgate such regulations, as are necessary to carry out this title. (b) TRANSFER OF PROJECTS.—Nothing in this title authorizes the transfer of pre-existing facilities or pre-existing components of any water system from Federal to private ownership or from private to Federal ownership. (c) FEDERAL RECLAMATION LAW.—Nothing in this title supersedes or amends any Federal law associated with a project, or portion of a project, constructed under Federal reclamation law. (d) INTERAGENCY COORDINATION.—The Secretary shall coordinate the Program carried out under this title with existing Federal and State rural water and wastewater programs to facilitate the most efficient and effective solution to meeting the water needs of the non-Federal project sponsors. (e) MULTIPLE INDIAN TRIBES.—In any case in which a contract is entered into with, or a grant is made, to an organization to perform services benefitting more than 1 Indian tribe under this title, the approval of each such Indian tribe shall be a prerequisite to entering into the contract or making the grant. (f) OWNERSHIP OF FACILITIES.—Title to any facility planned, designed, and recommended for construction under this title shall be held by the non-Federal project entity. (g) EXPEDITED PROCEDURES.—If the Secretary determines that a community to be served by a proposed rural water supply project has urgent and compelling water needs, the Secretary shall, to the maximum extent practicable, expedite appraisal investigations and reports conducted under section 105 and feasibility studies and reports conducted under section 106. (h) EFFECT ON STATE WATER LAW.—

VerDate 14-DEC-2004

12:05 Jul 13, 2007

Jkt 059194

PO 00003

Frm 00158

Fmt 6580

Sfmt 6581

E:\PUBLAW\PUBL003.109

APPS06

PsN: PUBL003