Federal cost of $30,550,000 and an estimated non-Federal cost of $34,450,000. (b) CONSTRUCTION OF SHORELINE PROTECTION PROJECTS BY NON-FEDERAL INTERESTS.—The Secretary shall enter into a partnership agreement with the non-Federal interest in accordance with section 206 of the Water Resources Development Act of 1992 (33 U.S.C. 426i–1) for the modified project. SEC. 3050. PEANUT ISLAND, FLORIDA.
The maximum amount of Federal funds that may be expended for the project for improvement of the quality of the environment, Peanut Island, Palm Beach County, Florida, being carried out under section 1135 of the Water Resources Development Act of 1986 (33 U.S.C. 2309a) shall be $9,750,000. SEC. 3051. PORT SUTTON, FLORIDA.
The project for navigation, Port Sutton, Florida, authorized by section 101(b)(12) of the Water Resources Development Act of 2000 (114 Stat. 2577), is modified to authorize the Secretary to carry out the project at a total cost of $12,900,000. SEC. 3052. TAMPA HARBOR-BIG BEND CHANNEL, FLORIDA.
The project for navigation, Tampa Harbor-Big Bend Channel, Florida, authorized by section 101(a)(18) of the Water Resources Development Act of 1999 (113 Stat. 276) is modified to direct the Secretary to credit, in accordance with section 221 of the Flood Control Act of 1970 (42 U.S.C. 1962d–5b), toward the non-Federal share of the cost of the project the cost of planning, design, and construction work carried out by the non-Federal interest for the project before the date of the partnership agreement for the project. SEC. 3053. TAMPA HARBOR CUT B, FLORIDA.
(a) IN GENERAL.—The project for navigation, Tampa Harbor, Florida, authorized by section 101 of the River and Harbor Act of 1970 (84 Stat. 1818), is modified to authorize the Secretary to construct passing lanes in an area approximately 3.5 miles long and centered on Tampa Harbor Cut B if the Secretary determines that such improvements are necessary for navigation safety. (b) GENERAL REEVALUATION REPORT.—The non-Federal share of the cost of the general reevaluation report for Tampa Harbor, Florida, being conducted on June 1, 2005, shall be the same percentage as the non-Federal share of the cost of construction of the project. (c) AGREEMENT.—The Secretary shall enter into a new partnership agreement with the non-Federal interest to reflect the cost sharing required by subsection (b). SEC. 3054. ALLATOONA LAKE, GEORGIA.
dkrause on GSDDPC44 with PUBLAW
(a) LAND EXCHANGE.— (1) IN GENERAL.—The Secretary may exchange land above 863 feet in elevation at Allatoona Lake, Georgia, identified in the Real Estate Design Memorandum prepared by the Mobile district engineer, April 5, 1996, and approved October 8, 1996, for land on the north side of Allatoona Lake that is required for wildlife management and protection of the water quality and overall environment of Allatoona Lake.