Page:United States Statutes at Large Volume 121.djvu/1628

This page needs to be proofread.
[121 STAT. 1607]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1607]

PUBLIC LAW 110–140—DEC. 19, 2007

121 STAT. 1607

Subtitle C—High-Performance Federal Buildings SEC. 431. ENERGY REDUCTION GOALS FOR FEDERAL BUILDINGS.

Section 543(a)(1) of the National Energy Conservation Policy Act (42 U.S.C. 8253(a)(1)) is amended by striking the table and inserting the following: ‘‘Fiscal Year 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

................................................................................................... ................................................................................................... ................................................................................................... ................................................................................................... ................................................................................................... ................................................................................................... ................................................................................................... ................................................................................................... ................................................................................................... ...................................................................................................

Percentage Reduction 2 4 9 12 15 18 21 24 27 30.’’.

SEC. 432. MANAGEMENT OF ENERGY AND WATER EFFICIENCY IN FEDERAL BUILDINGS.

dkrause on GSDDPC44 with PUBLAW

Section 543 of the National Energy Conservation Policy Act (42 U.S.C. 8253) is amended by adding at the end the following: ‘‘(f) USE OF ENERGY AND WATER EFFICIENCY MEASURES IN FEDERAL BUILDINGS.— ‘‘(1) DEFINITIONS.—In this subsection: ‘‘(A) COMMISSIONING.—The term ‘commissioning’, with respect to a facility, means a systematic process— ‘‘(i) of ensuring, using appropriate verification and documentation, during the period beginning on the initial day of the design phase of the facility and ending not earlier than 1 year after the date of completion of construction of the facility, that all facility systems perform interactively in accordance with— ‘‘(I) the design documentation and intent of the facility; and ‘‘(II) the operational needs of the owner of the facility, including preparation of operation personnel; and ‘‘(ii) the primary goal of which is to ensure fully functional systems that can be properly operated and maintained during the useful life of the facility. ‘‘(B) ENERGY MANAGER.— ‘‘(i) IN GENERAL.—The term ‘energy manager’, with respect to a facility, means the individual who is responsible for— ‘‘(I) ensuring compliance with this subsection by the facility; and ‘‘(II) reducing energy use at the facility. ‘‘(ii) INCLUSIONS.—The term ‘energy manager’ may include— ‘‘(I) a contractor of a facility; ‘‘(II) a part-time employee of a facility; and ‘‘(III) an individual who is responsible for multiple facilities. ‘‘(C) FACILITY.—

VerDate Aug 31 2005

07:12 Jan 26, 2009

Jkt 059194

PO 00002

Frm 00315

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT2.001

APPS10

PsN: 59194PT2