Page:United States Statutes at Large Volume 60 Part 1.djvu/677

This page needs to be proofread.

PUBLIC LAWS-CH. 596-JULY 24, 1946 Whitlow Ranch Reservoir, Ariz. I I GILA RIVER BASIN The project for the Whitlow Ranch Reservoir on Queen Creek, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in his report dated June 24, 1946, at an estimated cost of $1,645,000. GREAT SALT BASIN Spanish Fork River, The project for local flood protection on Spanish Fork River, Utah, is hereby authorized substantially in accordance with the recom- mendations of the Chief of Engineers in House Document Numbered 518, Seventy-ninth Congress, second session, at an estimated cost of $74,500. salt Lake City, The project for flood protection at Salt Lake City, Utah, on Jordan River, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Num- bered 562, Seventy-ninth Congress, second session, at an estimated cost of $412,000. Magna, Utah. The project for flood protection at Magna, Utah, on Little Valley Wash, is hereby authorized substantially in accordance with the recom- mendations of the Chief of Engineers in House Document Numbered 562. Seventy-ninth Congress, second session, at an estimated cost of $222,000. Additional appro priation authorized. 55 Stat. 638 . 33U.S.C., Supp. V, §701b d seq. Ante, p. 642; post, p. 652. Salinas River, Calif. Lucky l'ak Reser- voir, Idabo. Arrow Rock Dam. Additional appro- priation authorized. 52 Stat. 1215. 33U.S.C.§701b et seq.; Supp. V, § 701b et seg. Eugene, Oreg. LOS ANGELES-SAN GABRIEL BASIN AND BAIJONA CREEK In addition to previous authorizations, there is hereby authorized to be appropriated the sum of $25,000,000 for the prosecution of the comprehensive plan for the Los Angeles-San Gabriel Basin and Ballona Creek, California, approved in the Act of August 18, 1941, as amended and supplemented, by subsequent Acts of Congress. SALINAS RIVER BASIN The project for flood protection along Salinas River, California, is hereby authorized substantially in accordance with the recommenda- tions of the Chief of Engineers in his report dated April 29, 1946, at an estimated cost of $1,905,000. BOISE RIVER BASIN The project for the Lucky Peak Reservoir on Boise River, Idaho, is hereby authorized substantially in accordance with the recommenda- tions of the Chief of Engineers in his report dated May 13, 1946, at an estimated cost of $10,684,000: Provided, That said dam and reservoir shall be so constructed as not substantially to damage the structure of the Arrow Rock Dam and shall be operated in such manner as not materially to interfere with the operation of said Arrow Rock Reservoir. WILLAMETTE RIVER BASIN In addition to previous authorizations, there is hereby authorized to be appropriated the sum of $35,000,000 for the prosecution of the comprehensive plan for the Willamette River Basin approved in the Act of June 28, 1938, as amended and supplemented by subsequent Acts of Congress. The project for flood protection on Amazon Creek at Eugene and vicinity, Oregon, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Docu- ment Numbered 138, Seventy-ninth Congress, second session, at an estimated cost of $226,000. [60 STAT.