Page:United States Statutes at Large Volume 76.djvu/1271

This page needs to be proofread.
[76 Stat. 1223]
PUBLIC LAW 87-000—MMMM. DD, 1962
[76 Stat. 1223]

76

STAT.]

PUBLIC LAW 87-880-OCT. 24, 1962

1223

struction and rehabilitation" contained in this Act shall be available for construction work by force account: Provided, That this paragraph shall not apply to work performed under the Rehabilitation and Betterment Act of 1949 (63 Stat. 724). 43 USC 504 and After September 30, 1962, the position of Commissioner of Reclama- "°**tion shall have the annual rate of compensation as provided for positions listed in section 2205(a) of title 5, United States Code, so long as held by the present incumbent. BONNEVILLE POWER ADMINISTRATION CONSTRUCTION

For construction and acquisition of transmission lines, substations, and appurtenant facilities, as authorized by law, and purchase of one aircraft, $29,800,000, to remain available until expended. OPERATION AND M A I N T E N A N C E

For necessary expenses of operation and maintenance of the Bonneville transmission system and of marketing electric power and energy, $12,713,000. ADMINISTRATIVE PROVISIONS

Appropriations of the Bonneville Power Administration shall be available to carry out all the duties imposed upon the Administrator pursuant to law. Appropriations made herein to the Bonneville Power Administration shall be available in one fund, except that the appropriation herein made for operation and maintenance shall be available only for the service of the current fiscal year. Other than as may be necessary to meet local emergencies, not to exceed 12 per centum of the appropriation for construction herein made for the Bonneville Power Administration shall be available for construction work by force account or on a hired-labor basis. SOUTHEASTERN POWER ADMINISTRATION OPERATION AND MAINTENANCE

For necessary expenses of operation and maintenance of power transmission facilities and of marketing electric power and energy pursuant to the provisions of section 5 of the Flood Control Act of 1944 (16 U.S.C. 825s), as applied to the southeastern power area, $800,000 including purchase of two passenger motor vehicles of which one is for replacement only. SOUTHWESTERN POWER ADMINISTRATION CONSTRUCTION

For construction and acquisition of transmission lines, substations, and appurtenant facilities, and for administrative expenses connected therewith, in carrying out the provisions of section 5 of the Flood Control Act of 1944 (16 U.S.C. 825s), as applied to the southwestern power area, $7,210,000, to remain available until expended. OPERATION AND MAINTENANCE

For necessary expenses of operation and maintenance of power transmission facilities of marketing electric power and energy pursuant to the provisions of section 5 of the Flood Control Act of 1944

ssstat.sso.