Page:United States Statutes at Large Volume 76.djvu/652

This page needs to be proofread.
[76 Stat. 604]
PUBLIC LAW 87-000—MMMM. DD, 1962
[76 Stat. 604]

604

73 Stat. 86. Conditions.

Determinations.

Congressional authorization.

PUBLIC LAW 87-701~SEPT. 26, 1962

[76 STAT.

provided herein: And provided further, That no basis for arrangement need be resubmitted to the Joint Committee for the sole reason that the estimated amount of the cost to be incurred by the Commission exceeds the estimated cost previouslj'^ submitted to the Joint Committee by not more than fifteen per centum. (c) I n the event no satisfactory proposal for a cooperative arrangement is received, the Commission may, if the project is still deemed desirable, proceed with design, construction, and operation of such a reactor plant at a Commission installation. The electric energy generated shall be used by the Commission in connection with the operation of such installation and the provisions of section 112 of Public Law 86-50 shall be applicable to this project. SEC. 112. (a) The Commission is not authorized— (1) to enter into any arrangements for the construction or operation of electric generating and transmission facilities at the Hanford New Production Reactor, or (2) to sell any byproduct energy produced incident to the operation of the reactor and is directed to withhold from beneficial use and dissipate such byproduct energy, or (3) to enter into agreements, as part of such arrangements, to lease or contract for the operation of the reactor during periods when the reactor is not being operated or maintained for production or other Commission purposes, unless and until the Commission shall make the determinations required by subsection (b). (b) Before entering into any arrangement or sale of the type described in subsection (a), the Commission shall make the following determinations: (1) Useable byproduct energy will be produced incident to the production of special nuclear material in the reactor in accordance with the design of the reactor as originally authorized by Congress; (2) The sale of byproduct energy could provide a substantial financial return to the United States Treasury for the benefit of the taxpayers; (3) The national defense posture would be improved by the enhanced capability for resumption of special nuclear material production through non-Federal operation and maintenance of the reactor during periods when it is not being operated for special nuclear material production. (c) All expenses of modifications of the Hanford New Production Reactor made at the request of a non-Federal entity, and all expenses of constructing and operating the electric energy generating and transmission facilities at the New Production Reactor, shall be borne by such non-Federal entity. (d) Any losses to the Bonneville Power Administration, in connection with the arrangements or sales authorized herein, shall be borne by its system customers through rate adjustments. (e) The Commission shall not enter into any arrangements for the sale of byproduct energy from the Hanford New Production Reactor unless it determines that the purchaser has offered fifty per cent participation to private organizations and fifty per cent participation to public organizations on a non-discriminatory basis in the sale of electric energy generated therewith. (f) No Federal agency may acquire the generating facilities without prior Congressional authorization and in the event of such authorization the generating facilities shall be acquired subject to contracts then in existence for disposition of the electric energy produced by the facilities.