Page:United States Statutes at Large Volume 78.djvu/890

This page needs to be proofread.

[78 STAT. 848]
PUBLIC LAW 88-000—MMMM. DD, 1964
[78 STAT. 848]

848

PUBLIC LAW 88-565-SEPT. 2, 1964

[78 STAT.

Public Law 88-565 September 2, 1964

[^li^]

Dixie Project, Utah.

43 USC 371 note.

Construction. Commencement.

Interest rate.

^^

ACT

To authorize the Secretary of the Interior to construct, operate, and maintain the Dixie project, Utah, and for other purposes. Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That, for the purposes of developing the water resources of the Virgin and Santa Clara Rivers, including the furnishing of municipal and industrial water supplies, the furnishing of an irrigation water supply to approximately twenty-one thousand acres of land, the control of floods, the generation and sale of electric energy, the conservation and development of fish and wildlife resources, and the enhancement of recreation opportunities, the Secretary of the Interior is authorized to construct, operate, and maintain the Dixie project, Utah. The project shall consist of the Virgin City Dam and Reservoir, tunnels, canals, siphons, pumping plants, and other works necessary to serve irrigated and irrigable lands along and adjacent to the Virgin River; a dam on the Santa Clara River near Gunlock, Utah, and other works necessary to serve irrigated and irrigable lands along and adjacent to the Santa Clara River and on Ivins Bench; and hydroelectric plants and transmission facilities at the Virgin City Dam and at such other points as are desirable. The Dixie project shall be coordinated with the Cedar City water development program which includes the diversion of the waters of Crystal Creek into the Kolob Reservoir, and after completion of the Dixie project said waters of Crystal Creek and of the natural watershed of said Kolob Reservoir shall be exported for use of Cedar City and vicinity in accordance with an agreement entered by Cedar City and Iron County, Utah, on the 26th day of August 1953, with Kolob Reservoir and Storage Association, Incorporated, and Washington County, Utah. SEC. 2. The project shall include such measures for the disposition of saline waters of La Verkin Springs as are necessary in the opinion of the Secretary to insure the delivery of water at downstream points along the Virgm River for water users in the States of Arizona and Nevada of suitable quality for irrigation, or provision shall be made to indemnify such water users for any impairment of water quality for irrigation purposes directly attributable to Dixie project operations. SEC. 3. In constructing, operating, and maintaining the works authorized by this Act, the Secretary shall be governed by the Federal reclamation laws (Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto), except as is otherw^ise provided in this Act. SEC. 4. Construction of the project shall not be commenced until there shall be established a conservancy district or similar organization with such powers as may be required by the Secretary, these to include powers to tax both real and personal property within the boundary of the district and to enter into contracts with the United States for the repayment of reimbursable costs. SEC. 5. The interest rate to be used for purposes of computing interest during construction and interest on the unpaid balance of those portions of the reimbursable costs which are properly allocable to commercial power development and municipal and industrial water supply shall be determined by the Secretary of the Treasury, as of the beginning of the fiscal year in which this bill is enacted, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due nor callable for redemption for fifteen years from date of