Page:United States Statutes at Large Volume 98 Part 3.djvu/562

This page needs to be proofread.

PUBLIC LAW 98-000—MMMM. DD, 1984

98 STAT. 2934

43 USC 1501 note. 43 USC 620 note.

43 USC 371 note, contracts with U.S.

Ante, p. 2933.

Reports.

PUBLIC LAW 98-569—OCT. 30, 1984

of stage I of the Lower Gunnison Basin unit, or of a portion of stage I, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in the Uncompahgre Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit's facilities. "(5) Portions of the McElmo Creek unit, Colorado, as components of the Dolores participating project, Colorado River Storage project, authorized by Public Law 90-537 and Public Law 84-485, consisting of all measures and all necessary appurtenant and associated works to reduce seepage only from the Towaoc-Highline combined canal. Rocky Ford laterals, Lone Pine lateral, and Upper Hermana lateral, and consisting of measures to replace incidental fish and wildlife values foregone. The Dolores participating project shall have salinity control as a project purpose insofar as these specific facilities are concerned: Provided, That the costs of construction and replacement of these specific facilities shall be allocated by the Secretary to salinity control and irrigation only after consultation with the State of Colorado, the Montezuma Valley Irrigation District, Colorado, and the Dolores Water Conservancy District, Colorado: And provided further, That such allocation of costs to salinity control will include only the separable and specific costs of these specific facilities and will not include any joint costs of any other facilities of the Dolores participating project. Repayment of costs allocated to salinity control shall be subject to this Act. Repayment of costs allocated to irrigation shall be subject to the Acts which authorized the Dolores participating project, the Reclamation Act of 1902, and Acts amendatory and supplementary thereto. Prior to initiation of construction of these specific facilities, or a portion thereof, the Secretary shall enter into contracts through which the non-Federal entities owning, operating, and maintaining the water distribution systems, or portions thereof, in the Montezuma Valley, singly or in concert, will assume the obligations specified in subsection (b)(2) relating to the continued operation and maintenance of the unit's facilities.". (c) Section 202 of such Act is further amended by inserting at the end thereof the following new subsections: "(b) In implementing the units authorized to be constructed pursuant to subsection (a), the Secretary shall carry out the following directions: "(1) As reports are completed describing final implementation plans for the unit, or any portion thereof, authorized by paragraph (5) of subsection (a), and prior to expenditure of funds for related construction activities, the Secretary shall submit such reports to the appropriate committees of the Congress and to the governors of the Colorado River Basin States. "(2) Non-Federal entities shall be required by the Secretary to contract for the long-term operation and maintenance of canal and lateral systems constructed pursuant to activities provided for in subsection (a): Provided, That the Secretary shall reimburse such non-Federal entities for the costs of such operation and maintenance to the extent the costs exceed the expenses that would have been incurred by them in the thorough and timely operation and maintenance of their canal and lateral