This page has been validated.
20 HRS. 40 MIN.

Elmer, who was overseeing the technical detail. Necessary instruments were installed and gradually tried out; while varying load tests, countless take-offs from the bay, and brief flights around Boston were made. The radio was tested and the inevitable last minute changes and adjustments arranged.

With the radio, we were particularly fortunate because Stultz is a skilful operator. It is unusual to find a man who is a great pilot, an instrument flyer, navigator, and a really good radio operator all in one.

Finally the ship itself was ready to go, and our problems focussed on the weather. At this stage weather is an important factor in all plans of trans-oceanic flying.

Supplementing the meagre reports available from ships to the Weather Bureau, the Friendship's backers arranged a service of their own. Special digests of the British reports were cabled to New York each morning, and meteor-

106