This page has been proofread, but needs to be validated.
158

STATE

ROUTE No.

DESCRIPTION

VERMONTAPRROVED U. S. 2 B.R.
Recognition of a
Business Route in
Montpelier
Proposed routing would be over former U.S. 2 through the city on Main and State Streets.
OHIOAPPROVED U. S. 6.
Relocation
This routing would be over Ohio State Route 384 which is being constructed as a high type highway and thereby avoiding a congested area in Bryan.
"
APPROVED
U. S. 62
Relocation
This routing would be over a new location between Canton and a point on old U. S. 62 north of Louisville.
"
APPROVED
U. S. 68
Abandonment of
Section
This proposal would eliminate the portion of U. S. 68 between U. S. 25 north of Findlay and a point about 3 miles southwest of Findlay. (Apparently U. S. 68 has been eliminate by Ohio from a point just north of Findlay to its northern terminus in Toledo, and this proposal would make the northern terminal point of U. S. 68 the intersection with U.S. 25 southwest of Findlay.)
"
APPROVED
U. S. 224
Relocation
This routing would be over a new high standard highway by-passing Tiffin on the south and west.
MISSISSIPPIAPPROVED U. S. 11 By-Pass
Abandonment
This proposal would eliminate U. S. 11 By-Pass marking established June 27, 1957 at Hattiesburg.
VIRGINIAAPPROVED U. S. 13
Relocation
Proposed marking would be over new routing leaving U. S. Routes 38 and 460 east of Suffolk at Magnolia then following present Virginia Route 337 southwesterly around and through the southeasterly part of Suffolk to present U. S. Route 13 in South Suffolk. Present U. S. Route 13 marking through the City proper would be eliminated and length of U. S. Route 13 would be reduced 0.10 mile.
KENTUCKYAPPROVED U. S. 31 E
Relocation
Proposed marking would be over a new high standard highway recently constructed between Lincoln Memorial Park and Magnolia. New routing would reduce travel distance on this route 2.5 miles.