Page:United States Statutes at Large Volume 106 Part 6.djvu/260

This page needs to be proofread.

106 STAT. 4818 PUBLIC LAW 102-580—OCT. 31, 1992 nia through existing Federal facilities at Whittier Narrows Dam, Los Angeles County, California. Reports (b) SANTA PAULA CREEK, CALIFORNIA.— Not later than 1 year after the date of the enactment of this Act, the Secretary shall complete the general reevaluation study for the proiect for flood control, Santa Paula Creek, California, authorized by the Flood Control Act of 1948 (62 Stat. 1175-1182) and transmit to Congress a report on the resulte of such study. (c) SUCCESS RESERVOIR, TULE RIVER, CALIFORNIA. -Not later than May 31, 1994, the Secretary shall complete and transmit to Congress a feasibility study for enlargement of the flood control project for the Success Reservoir, on the Tule River, California, auUiorized by section 10 of the Act entitled An Act authorizing the construction of certain public works on rivers and harbors for flood control, and for other purposes", approved December 22, 1944 (58 Stat. 901). The study shall include a review of the need for, and desirability of, construction of an upstream toe berm for reservoir embankment stability. The non-Federal share of the enlargement of the project shall be determined in accordance with section 903(c) of the Water Resources Development Act of 1986. (d) DISTRICT OF COLUMBIA AND MARYLAND. — (1) IN GENERAL.—The Secretary shall, as part of the ongoing review of the Anacostia River Watershed in the District of Colimibia and Maryland— (A) carry out a comprehensive assessment of adverse impacts to such watershed from Federal facilities; (B) review current plans for reducing such adverse impacts; and (C) carry out a feasibility study to identify and recommend measures for implementation to eliminate such adverse impacts. (2) AUTHORIZATION OF APPROPRIATIONS.— T here is authorized to be appropriated to carry out this subsection $3,000,000 for fiscal years beginning after September 30, 1992. Such sums \ shall remain available until expended. (e) CANAVERAL HARBOR, FLORIDA.—The Secretary shall expeditiously complete the General Design Memorandum for the sand transfer portion of the navigation project for Canavercd Harbor, Florida, authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1174). (f) TAMPA HARBOR, ALAFIA RIVER AND BIG BEND, FLORIDA. — The Secretary shall complete in an expeditious manner that portion of the navigation study for Tampa Harbor, Alafia River and Big Bend, Florida, relating to the Alafia River. The Secretary may accept contributions from non-Federal sponsors to cover costs incurred by the Secretary in ccurrying out such portion of such study. (g) CEDAR RIVER AND TRIBUTARIES, BLACKHAWK, IOWA. —The Secretary shall complete the feasibility study for Cedar River and tributaries, Blackhawk, Iowa, not later thsui the last day of the 18-month period beginning on the date of the enactment of this Act. (h) PORT FOURCHON NAVIGATION CHANNEL, LOUISIANA. —The Secretary shall complete the study for Federal maintenance of the Port Fourchon Navigation Chsumel, Louisiana, not later than the last day of the 12-month period beginning on the date of the enactment of this Act.