Page:United States Statutes at Large Volume 106 Part 6.djvu/262

This page needs to be proofread.

106 STAT. 4820 PUBLIC LAW 102-580—OCT. 31, 1992 cule flood gates with taintor gates, and provision of a 40-year level offloodprotection. (n) LITTLE RIVER, NIAGARA FALLS, NEW YORK.—The Secretary shall complete the feasibility study for Little River, City of Niagara Falls, New York, not later than the last day of the 18-month period beginning on the date of the enactment of this Act. (o) STRAWBERRY ISLAND, NEW YORK— (1) COMPLETION OF STUDY. —The Secretary shall complete the feasibliiW study of shoreline protection for Strawberrv Island, New York, not later than the last day of the 18-month period beginning on the date of the enactment of this Act. (2) INTERIM EMERGENCY MEASURES.— Pending completion of the stu(^ of shoreline protection for Strawberry Island, New York, the Secretary shall undertake such emergency measures as may be necessary to provide shoreline protection for Strawbeny Island. (p) WiSTER LAKE, OKLAHOMA. — (1) STUDY.— The Secretary shall complete a study of the flood control project for Wister Lake, LeFlore County, Oklahoma, authorized by section 4 of the Flood Control Act of June 28, 1938 (52 Stat. 1218), for the purpose of determining the feasibility of modiMng the project to increase the level of the conservation pool by 1 foot and to a4just the seasonal pool operation to accommodate the change in the conservation pool elevation. (2) REPORT. —Not later than 1 year after the date of the enactment of this Act, the Secretary shall transmit to Congress a report on the results of study conducted under paragraph (1). (q) SALMON HARBOR, OREGON.— The Federal share of the cost of completion of the study for mitigation of shoreline damage attributable to the Federal navigation project at Salmon Harbor, Oregon, authorized by section 111 of the River and Harbor Act of 1968 (82 Stat. 735), shall be 100 percent. (r) HAMPTON AND POQUOSON, VIRGINIA.— (1) STUDY. —The Secretary shall conduct independent studies to determine the Federal interest in and feasibility of providing improvements to the Chesapeake Bav shoreline in the cities of Hampton and Poquoson, Virginia, for environmental protection and enhancement, and protection against high tides and wave action as a result of hurricane and other storm events. (2) REPORT. —The Secretary shall submit to Congress a report on the results of the studies conducted under this subsection together with a plan of action which the Secretary recommends and an estimate of the cost of implementing such plan. (s) CORPUS CHRISTI Smp CHANNEL, TEXAS. —The Secretary shall conduct a study of the proiect for navigation. Corpus Christi Ship Channel, Texas, autiiorized by section 101 of the River and Hcurbor Act of 1958 (72 Stat. 298), for the purpose of determining the feasibility of modifying the project to include maintenance of the Jewel Fulton Canal at a deptn of 17 feet as a Federal responsibility, (t) TUG VALLEY GREENWAY, WEST VIRGINIA.— (1) STUDY.—The Secretary is directed to conduct a study to determine the feasibility of establishirig a "Tug Valley Greenway", in relation to those projects along the Tug Fork River