Page:United States Statutes at Large Volume 121.djvu/1183

This page needs to be proofread.
[121 STAT. 1162]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1162]

121 STAT. 1162

PUBLIC LAW 110–114—NOV. 8, 2007

dkrause on GSDDPC44 with PUBLAW

(c) SOUTHPORT HARBOR, FAIRFIELD, CONNECTICUT.—The project for navigation, Southport Harbor, Fairfield, Connecticut, authorized by section 2 of the River and Harbor Act of March 2, 1829, and by the first section of the River and Harbor Act of August 30, 1935 (49 Stat. 1029), and section 364 of the Water Resources Development Act of 1996 (110 Stat. 3733–3734), is modified to redesignate a portion of the 9-foot-deep channel to an anchorage area, approximately 900 feet in length and 90,000 square feet in area, and lying generally north of a line with points at coordinates N108,043.45, E452,252.04 and N107,938.74, E452,265.74. (d) SACO RIVER, MAINE.—The portion of the project for navigation, Saco River, Maine, constructed under section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577) and described as a 6foot deep, 10-acre maneuvering basin located at the head of navigation, is redesignated as an anchorage area. (e) UNION RIVER, MAINE.—The project for navigation, Union River, Maine, authorized by the first section of the Act of June 3, 1896 (29 Stat. 215), is modified by redesignating as an anchorage area that portion of the project consisting of a 6-foot turning basin and lying northerly of a line commencing at a point N315,975.13, E1,004,424.86, thence running north 61 degrees 27 minutes 20.71 seconds west about 132.34 feet to a point N316,038.37, E1,004,308.61. (f) MYSTIC RIVER, MASSACHUSETTS.—The portion of the project for navigation, Mystic River, Massachusetts, authorized by the first section of the River and Harbor Appropriations Act of July 13, 1892 (27 Stat. 96), between a line starting at a point N515,683.77, E707,035.45 and ending at a point N515,721.28, E707,069.85 and a line starting at a point N514,595.15, E707,746.15 and ending at a point N514,732.94, E707,658.38 shall be relocated and reduced from a 100-foot wide channel to a 50-foot wide channel after the date of enactment of this Act described as follows: Beginning at a point N515,721.28, E707,069.85, thence running southeasterly about 840.50 feet to a point N515,070.16, E707,601.27, thence running southeasterly about 177.54 feet to a point N514,904.84, E707,665.98, thence running southeasterly about 319.90 feet to a point with coordinates N514,595.15, E707,746.15, thence running northwesterly about 163.37 feet to a point N514,732.94, E707,658.38, thence running northwesterly about 161.58 feet to a point N514.889.47, E707,618.30, thence running northwesterly about 166.61 feet to a point N515.044.62, E707,557.58, thence running northwesterly about 825.31 feet to a point N515,683.77, E707,035.45, thence running northeasterly about 50.90 feet returning to a point N515,721.28, E707,069.85. (g) RIVERCENTER, PHILADELPHIA, PENNSYLVANIA.—Section 38(c) of the Water Resources Development Act of 1988 (33 U.S.C. 59j– 1; 102 Stat. 4038) is amended by striking ‘‘subsection (a) of this section’’ and inserting ‘‘subsection (a) (except 30 years from such date of enactment, in the case of the area or any part thereof described in subsection (a)(5))’’. (h) ADDITIONAL DEAUTHORIZATIONS.—The following projects are not authorized after the date of enactment of this Act, except with respect to any portion of such a project which portion has been completed before such date or is under construction on such date:

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01160

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1