Page:United States Statutes at Large Volume 121.djvu/1182

This page needs to be proofread.
[121 STAT. 1161]
PUBLIC LAW 110-000—MMMM. DD, 2007
[121 STAT. 1161]

PUBLIC LAW 110–114—NOV. 8, 2007

121 STAT. 1161

dkrause on GSDDPC44 with PUBLAW

(B) DESCRIPTION OF PORTION.—The portion of the project described in subparagraph (A) is more particularly described as the portion beginning at a point along the southern limit of the existing project, N254,332.00, E1,023,103.96, thence running northwesterly about 761.60 feet to a point along the western limit of the existing project N255,076.84, E1,022,945.07, thence running southwesterly about 38.11 feet to a point N255,038.99, E1,022,940.60, thence running southeasterly about 267.07 feet to a point N254,772.00, E1,022,947.00, thence running southeasterly about 462.41 feet to a point N254,320.06, E1,023,044.84, thence running northeasterly about 60.31 feet to the point of origin. (10) WHATCOM CREEK WATERWAY, BELLINGHAM, WASHINGTON.—The portion of the project for navigation, Whatcom Creek Waterway, Bellingham, Washington, authorized by the River and Harbor Act of June 25, 1910 (36 Stat. 664), and section 101 of the River and Harbor Act of 1958 (72 Stat. 299), consisting of the last 2,900 linear feet of the inner portion of the waterway and beginning at station 29+00 to station 0+00. (11) OCONTO HARBOR, WISCONSIN.— (A) IN GENERAL.—The portion of the project for navigation, Oconto Harbor, Wisconsin, authorized by the Act of August 2, 1882 (22 Stat. 196), and the Act of June 25, 1910 (36 Stat. 664) (commonly known as the ‘‘River and Harbor Act of 1910’’), consisting of a 15-foot-deep turning basin in the Oconto River, as described in subparagraph (B). (B) PROJECT DESCRIPTION.—The project referred to in subparagraph (B) is more particularly described as— (i) beginning at a point along the western limit of the existing project, N394,086.71, E2,530,202.71; (ii) thence northeasterly about 619.93 feet to a point N394,459.10, E2,530,698.33; (iii) thence southeasterly about 186.06 feet to a point N394,299.20, E2,530,793.47; (iv) thence southwesterly about 355.07 feet to a point N393,967.13, E2,530,667.76; (v) thence southwesterly about 304.10 feet to a point N393,826.90, E2,530,397.92; and (vi) thence northwesterly about 324.97 feet to the point of origin. (b) ANCHORAGE AREA, NEW LONDON HARBOR, CONNECTICUT.— The portion of the project for navigation, New London Harbor, Connecticut, authorized by the River and Harbor Appropriations Act of June 13, 1902 (32 Stat. 333), that consists of a 23-foot waterfront channel and that is further described as beginning at a point along the western limit of the existing project, N188, 802.75, E779, 462.81, thence running northeasterly about 1,373.88 feet to a point N189, 554.87, E780, 612.53, thence running southeasterly about 439.54 feet to a point N189, 319.88, E780, 983.98, thence running southwesterly about 831.58 feet to a point N188, 864.63, E780, 288.08, thence running southeasterly about 567.39 feet to a point N188, 301.88, E780, 360.49, thence running northwesterly about 1,027.96 feet to the point of origin, is redesignated as an anchorage area.

VerDate Aug 31 2005

13:52 Jan 23, 2009

Jkt 059194

PO 00001

Frm 01159

Fmt 6580

Sfmt 6581

M:\STATUTES\2007\59194PT1.001

APPS10

PsN: 59194PT1